04 January 2010

Senior Structural Engineer

Position: Senior Structural Engineer
Location: KualaLumpur, Malaysia
Commence: Feb2010
Duration: 36months
Criteria:-
  • Degree in Civil or Structural Engineering
  • Good command of written & spoken English
  • 8years in O&G
  • 5years as senior engineer

Completion Engineer

Position: Completion Engineer
Location: Vungtau, Vietnam
Commence: Feb2010
Criteria:-
  • 2 development wells.
  • Start April2010
  • Water depth +87m MSL
  • Wellhead Height +24m
  • Jack up type.
  • BHT 148 degree C
  • BHP 5,877 psi
  • pipesim nodal for all wells.
  • Incorporate files into pipenet
  • create full gas system model for RD/RDT production platform
  • completions design for 2 development wells.
  • Define wellbore deliverability form all well
  • well testing operations (design and well testing offshore management)
  • perforating strategy for each well (bottoms up, specific intervals, or all intervals at one time).
  • Design rigless, slickline, perforating and cleanup operations after drilling operations are completed.
  • Design PLT operations after drilling operations are completed.
  • Analysis of PLT data and flow allocation.

Technical Writer

Position: Technical Writer
Location: Johor, Malaysia
Commence: Feb2010
Duration: 6months
Criteria:-
  • Start-up & Operating Procedure Manual for Development Project
  • Fluent in spoken & written English.
  • 10years in Plant Operations
  • Offshore Operations experience
  • 2projects in developing Start-up & Operating Manuals.
  • produce the Start-up and operations Manual.
  • stationed full time at Fabrication Yard, Pasir Gudang, Johor.
  • have laptop and transport.

31 December 2009

General Inspector Pipeline

Position: General Inspector (Pipeline)
Location: Turkmenistan
Commence: Mar2010
Duration: 1year
Optional: yearly extension
Criteria:-
  • Diploma or SPM or high school
  • Certificate in CSWIP 3.1 and 3.4
  • thorough knowledge of NDT techniques and methods, pipeline welding and pipeline coating
  • 5years as QC Inspector for offshore / onshore pipeline installation
  • 10years in O&G
  • Familiar with pipeline installation / construction relevant code and standard (e.g API1104 etc).
  • worked 3 projects for PSC projects satisfactorily.
  • knowledgeable in more than one discipline of Quality Control.
  • perform those activities required properly.
  • organizational and administrative ability.
  • Proficient in English language.
  • Russian language is advantage

30 December 2009

SAP / CCMS Specialist

Position: SAP / CCMS Specialist
Location: KualaLumpur, Malaysia
Commence: Jan2010
Duration: 1year
Optional: yearly extension
Criteria:-
  • University Degree.
  • Membership of CIPS
  • 10years in resources industry to major O&G contract management.
  • knowledgeable and competent in 1SAP, GSAP and CCMS.
  • knowledgeable and competent in new Group Level supply procedures.
  • understanding of upstream E&P business
  • Advanced risk management skills
  • Superior problem solving skills
  • English Fluent