23 September 2008

Perforation Equipments & Services

Position: Perforation Equipments & Services
Location: Malaysia
Commence: 2009
Oil wells: 13-3/8”, 9-5/8”, 7”, 3-1/2”, 4-1/2”, 5-1/2”
Gas Producer, Water Injector, Gas Injector wells: 13-3/8”, 9-5/8”, 5-1/2”
Temp (F): 250-310
Pressure (psia): 2200-4060
CO2: 5-75%
Hg liquid phase (ppm): 0-20
Other concerns: Mercaptans, Radon
  • Perforation with dynamic underbalance gun option.
  • Well Integrity (Cement Evaluation, Corrosion Evaluation and Monitoring)
  • Production Logging
  • Pipe Recovery
  • Formation Evaluation in Cased Hole condition
  • Misc (Free Point/Backoff Tool, Wireline Set Plugs and Patches, Tubing puncher, Junk Catcher, Straddle, Bridge plug, other e-line services)